Background
Anser analysed the requirements from the Shire of Augusta Margaret River and undertook an assessment of the existing Sole Use 300kVA Transformer. 

Scope
The Shire didn't know the loading of the existing transformer and required assistance with current and future load calculations.  Anser completed a comprehensive load assessment. 
 
Outcomes
The outcome of the assessment was a finding that the additional building extension loads would likely cause overloading of the existing transformer during summer.   Anser recommended an upgrade to a 1000kVA transformer and obtained a cost competitive quotation for the transformer upgrade.
The Shire of Augusta Margaret River was intending to undertake significant extensions and modification to its existing administration and exhibition centre. This required an assessment of existing loads and an analysis of future required loads.